The state-of-the-art education and research Keck Center for Science and Engineering, the largest and most expensive building project in the school’s history, will be transformative for Chapman University’s science students and faculty. The 149,697 SF, three-story building will be divided into two parts. The center includes 18 teaching labs, 22 research labs, 47 faculty and graduate student offices, and three multi-purpose classrooms. The project also features an auditorium with rooftop stadium seating for over 800 people and a 145,769 SF, 344 stall, two-level subterranean parking structure. At Superior Wall Systems, we completed metal stud framing, drywall as well as Swiss Pearl and Resysta rain screen systems..
©2022 Superior Wall Systems. All Rights Reserved.